Full Refurbishment – Jarrow Civic Hall

The Project

What was involved with the project

The initial project involved the installation of a brand new bath with shower screen, tiling of the walls and floor, installation of new heated towel rail and re-boxing of the toilet and sink pipes.

 

The job was not easy due to the shape of the bathroom however, we were determined to do a good job!

Upon removing the bath, we discovered that there was severe water damage to the joists beneath the bath, before carrying on with the fitting of the bath we needed to repair the damage to the joists.

The repair of the joist was a success and we managed to install the new bath with great care as we maneuvered it into the ‘L’ shaped bathroom.


Full project list

  • Bath Removal
  • Joist Repair
  • Bath Installation
  • Heated Towel Rail Installation
  • Bath & Heated Towel Rail Plumbing
  • New Pipe Boxing
  • Floor and Wall Tiling